SAAD-IES

ABOUT US

About CEO

The CEO of Saad-IES, Mr. Saif Ur Rehman, has 30+ years of experience of Consultancy, Design, Production and Project Management on Industrial, Hospitals and Construction Projects.

  • Development of Electro-Mechanical Systems for Process Automation.
  • Quality Management in manufacturing units.
  • Production Management of manufacturing Industry.
  • Design, installation & Commissioning of Furnaces and boilers Automation Systems.
  • Design of MEP Services for Hospitals and High-Rise Buildings.
  • Facilities Management
  • Utilities Management
  • Project Management of Construction Projects.
  • Site preparation for VDA Audit.
  • Energy Efficiency Management and Energy Audits of Buildings.
  • Active and Passive Network design for Green Buildings.

SAAD-IES Pvt. Ltd.

SAAD-IES Pvt. Ltd., established in 2004, is providing services from design phase to execution of MEP, HVAC and Industrial Power and Control Systems.

We are specialized in designing services for Hospitals and High-Rise Commercial Buildings according to the international standards and specified requirements.

Services

Design and Execution

  • Main Power Supply, Sub-Station, Generator House
  • Cabling, DBs
  • Lighting levels and Luminaire layouts
  • Switch Boards and Sockets distribution
  • Circuit Breakers specifications and coordination
  • Fire Alarm System with Layouts
  • CCTV Cameras System and Layouts
  • Voice and Data Networking
  • Active and Passive Energy Systems such as PV Systems
  • Control Systems for Boilers and Furnaces
  • ATS Panels and Synchronizing Systems for Generators and Utility Power
  • Control Systems for Automation through PLC and Relay Logics
  • Nurse Call system and Bed-Head Units along with other services for Hospitals
  • Medical Gas Systems for Hospitals
  • Project Management and Project Supervision
  • Development of BOQs, Tender Documents and Contract Agreements.

Other Services

  • Preparation of facility and Documentation for ISO-9000 Certification
  • Preparation of facility and Documentation for conducting VDA Audit
  • Development of system and documentation for Quality Control and Quality Assurance for facilities 
  • Annual Facility Management Contracts
  • Maintenance for Industrial Machines, HVAC, Generators, UPS and other equipment.

Our matchless experience and dedication render reliable services which ensure customer satisfaction and projects success.

Projects

Khyber Teaching Hospital Peshawar

  • Rehabilitation and Renovation of the two Absorption Chillers 525 RTons each

Hayatabad Medical Complex

  • Rehabilitation and Renovation of the Absorption Chiller 525 RTons

Shaukat Khanum Memorial Trust

  • Design of Electrical Services for the Construction of SKMCH&RC Peshawar

CMH Peshawar

  • Maintenance of the 80 kVA UPS and Replacement of the Battery Bank

Life-Care Hospital Hayatabad Peshawar

  • Consultancy for Electrical Services

Al-Falah Tower Peshawar

  • Design of Electrical Services

GIZ (German NGO)

  • Position: Project Manager
  • Project: Renovation & Rehabilitation of GTTI Lahore
  • Duration: Aug-21 to Nov-22

SKMCH&RC Peshawar

  • Position:

    HOD Project Office

    Projects:

    • Design of Electrical System of SKMCH&RC Peshawar
    • Project Management of construction of SKMCH&RC Peshawar

    Duration of Job/projects: 

    2013-2019 (Six Years)

     Milestones achieved:

    • Completed construction of SKMCH Peshawar
    • Completed construction of the five Radiation Bunkers

ORION Pvt. Ltd. Lahore

  • Chief Engineer / Consultant

    Projects

    • To operationalize the Auto-Assembly units
    • Preparation of Orion Pvt. Ltd. for ISO-9000 Audit
    • Preparation of Orion Pvt. Ltd. For VDA Audit

    Design/Amendments of Electro-Mechanical Assemblies

    Duration of Job/projects: Three years (2019-2022)

    Milestones achieved:

    • Production of LED Bulbs through Automatic Units
    • ISO-9000-2015 Certification
    • VDA Audi

Khyber Teaching Hospital Peshawar

  • Consultant / Head of Engineering Deptt. KTH/KCD/KMC Peshawar
  • Renovation and Rehabilitation of the 1100 RTons HVAC Plant (Absorption Chillers York)
  • Redesign of the Solution Pumps
  • Supervision of the Project: Construction of Burn Unit
  • Duration: Five years Contract: 2008-2012
  • Milestones achieved: Rehabilitated the AC Plant, completed assignments as HOD Engg. Deptt.

Training and Courses attended

    • Electro-Mechanical Design, PLCs and Automation
    •  Lightning Protection
    • PV Systems
    • Project Management
    • MS Project
    • Primavera
    • HVAC Design
    • SAP Plant Maintenance Module
    •  Vacuum Systems
     Internal Auditing ISO-9000